As part of our continuing upgrades to the electrical infrastructure on the estate the Mains Room (Substation) was the next location to have a refurbishment. This involved removing all the old switch gear and replacing it with a new panel board, extending cables where necessary and installing new supply cables. The last picture shows a […]
By in News with 0 Comments
This year we have been continuing with the electrical upgrades on the estate. This has involved removing old distribution turrets and installing new switching gear to the latest standards. Tests are also carried out on all cables and on this occasion a main distribution cable needed to be replaced.
By in Winter Projects with 0 Comments
The pond and drainage works on the southern end of the estate are coming along well despite the wet weather. Although, on the plus side, the pond has filled up quickly and now just waiting for warmer and dryer weather to complete the reinstatement and seed.
The new lighting and rails are complete on the car park
Despite the wet weather last week we managed to install a new cable duct (which is part of our electrical infrastructure upgrade) along with the cables required for the new car park lighting.
The new feature at the southern end of the estate is now complete. The area incorporates the following species of plantsNew Zealand flax (Phormium Tenax)Variegated New Zealand flax (Phormium Tenax Variegated)New Zealand flax Purpureum (Phormium Tenax Purpurea)Fountain Grass (Pennisetum Setaceum Fireworks)Eulalia (Miscanthus Sinensis Variegatus)