As part of our continuing upgrades to the electrical infrastructure on the estate the Mains Room (Substation) was the next location to have a refurbishment. This involved removing all the old switch gear and replacing it with a new panel board, extending cables where necessary and installing new supply cables. The last picture shows a section of one of the 7 supply cables used for the board.